If your Pinterest board is bursting and your countertops are… not, this kitchen remodel checklist is your new best friend. Below, AZA Builders (veteran-owned, licensed & insured) lays out the exact steps Northern Virginia homeowners in Fairfax, Arlington, and Loudoun use to go from cluttered galley to chef-worthy HQ without budget blowups or permit drama. When you’re ready, request a free estimate and we’ll tailor this plan to your home and timeline.
Ready for a personalized estimate? Call AZA Builders today at (571) 393-2722 or request a free quote.
Table of Contents
ToggleTL;DR: One-Page Kitchen Remodeling Checklist (Printable)
Planning & Budget
- Define must-haves vs. nice-to-haves (function first, pretty second).
- Set a total budget + 10–15% contingency.
- Shortlist styles/colors and build a mood board.
- Measure the space (walls, windows, ceiling height, utilities).
Design & Selections
- Choose layout (keep footprint or reconfigure).
- Cabinets (stock/semi/custom), countertops, sink/faucet.
- Appliances (sizes, specs, electrical/gas).
- Flooring, backsplash, lighting plan (task/ambient).
- Venting path & make-up air (code-compliant).
Permits & Prep
- Permit needs confirmed (Fairfax/Arlington/Loudoun).
- Order long-lead items (cabs, appliances, stone).
- Plan temporary kitchen + dust control/entry routes.
Construction
- Demo & haul-away (salvage where possible).
- Rough plumbing/electrical/HVAC/gas.
- Inspections passed; insulation where needed.
- Drywall/prime/paint.
- Flooring, cabinets, countertops.
- Tile/backsplash, trim, lighting & hardware.
- Appliance set, plumbing trims, final electrical.
Quality Control & Handover
- Punch list walk-through.
- Test GFCIs, venting, shutoffs, caulks.
- Get warranties & care guides.
- Photograph before/after (you’ll be glad you did).

Why This Kitchen Remodeling Checklist Beats “Just a Blog Post”
Most “kitchen renovation checklist” articles talk aesthetics but skip costs, codes, and logistics. We cover all three with Northern Virginia specifics—so you can plan confidently and actually enjoy the process.
- Local clarity: What Fairfax/Arlington/Loudoun inspectors look for.
- Real numbers: Cost and timeline ranges no vague hand-waving.
- Conversion-ready: Free consult, estimate, and downloadable checklist.
- Professional guardrails: What to order when, how to avoid backorders, and which tasks trigger permits.
Step-by-Step Kitchen Remodel Checklist (Northern Virginia Edition)
1) Define Vision & Scope (Before You Spend $1)
Goal: Lock your functional must-haves first; design choices flow from function.
- Audit pain points: storage, workflow triangle, seating, lighting, ventilation.
- Decide the scope: cosmetic refresh vs. pull-and-replace vs. full reconfiguration.
- Create a mood board (3–5 reference photos max curated beats chaos).
- Think future-proof: accessibility (clearances, lever handles), durable finishes, easy-clean.
Pro tip: If you cook nightly, invest in task lighting, venting, and counter space first; the statement tile can be your treat if budget survives.
2) Build a Realistic Budget (with Local Ranges)
| Scope (typical 10×12–12×14 NoVA kitchen) | Typical Range | What’s Included |
|---|---|---|
| Cosmetic refresh | $10k–$25k | Paint, lighting, hardware, minor plumbing/electrical, simple backsplash |
| Pull-and-replace | $35k–$75k | New cabinets (stock/semi), counters, flooring, lighting, appliances (mid-range), no wall moves |
| Reconfigure/major | $75k–$140k+ | Layout changes, structural, gas moves, panel upgrades, custom cabinetry, premium finishes |
Cost drivers: cabinet grade, counter material, appliance tier, layout changes, panel upgrades, permit/inspection fees, site access.
Contingency: 10–15% (20% for older homes or structural changes).
3) Design: Layouts, Cabinets, and Countertops
Layout: keep the existing footprint to save, or open to L-shape/galley with island/peninsula.
Cabinets:
- Stock: fastest, budget friendly.
- Semi-custom: best value + sizing flexibility.
- Custom: exact fit, integrated accessories, matched finishes.
Countertops: Quartz (low-maintenance), granite (natural), porcelain/ultra-compact (heat-resistant), butcher block (warmth; seal regularly).
Storage wins: full-height pantries, pull-outs, toe-kick drawers, tray dividers, hidden charging drawers.
Lighting plan: 3 layers ambient (recessed), task (under-cabinet), accent (pendants). Put each on dimmers.
Venting: exterior vented hood (target 600+ CFM for serious cooks size & duct per code).

4) Permits, Codes & Inspections (Fairfax • Arlington • Loudoun)
- Electrical: new circuits, panel upgrades, GFCIs/AFCIs, lighting additions → permit.
- Plumbing: moving sink, adding gas, new rough-ins → permit.
- Structural: removing load-bearing walls → engineer + permit.
- Venting/gas: sized and vented per manufacturer & code; makeup air may apply at higher CFM.
What this means for you: plan rough-in inspections before drywall. AZA Builders coordinates drawings, scheduling, and sign-offs so your project never stalls.
5) Order Long-Lead Items (Avoid Backorders)
- Cabinetry: 4–10+ weeks lead; order early.
- Appliances: confirm model numbers & cut-sheets before cabinet design.
- Countertops: template after cabinet set; plan 7–14 days to fabricate.
- Tile & specialty lighting: order 10% overage for breakage/cuts.
Sequence rule: design → order → demo. Never demo without core materials in hand or confirmed ETA.
6) Prepare the House (Future-You will thank you)
- Set up a temporary kitchen: microwave, toaster oven, hot plate, mini-fridge; stock disposable plates.
- Dust control: zipper walls, floor protection, negative air (we do all three).
- Staging: clear pathways, identify dumpster location, parking, pet plan.
- Communication: weekly check-ins; one owner point-of-contact + your AZA project manager.
7) Construction Timeline (What to Expect)
| Phase | Typical Duration | Notes |
|---|---|---|
| Demo & prep | 2–5 days | Protection, demo, rough cleanup |
| Rough-ins (M/E/P/Gas) | 1–2 weeks | Electrical/plumbing/HVAC/gas, blocking |
| Inspections | 2–5 days | County schedule dependent |
| Drywall + prime | 4–7 days | Hang, tape, mud, sand, prime |
| Flooring | 2–4 days | Stagger with paint where needed |
| Cabinets set | 2–4 days | Leveling/shimming matters |
| Countertops | 1–2 weeks | Template → fabricate → install |
| Tile/backsplash | 2–4 days | Waterproofing where needed |
| Finish electrical/plumbing | 1–3 days | Fixtures, appliances, testing |
| Punch list & clean | 2–5 days | Adjust doors, caulk, polish |
Average pull-and-replace: 6–10 weeks. Major reconfiguration: 10–14+ weeks.

8) Finish Strong: Details That Make It “Designer”
- Consistent sightlines (hood/uppers/pendants align).
- Panel-ready or trim kits to avoid appliance gaps.
- Outlet placement hidden under cabs/ends of island.
- Silicone at splash/counter seam; color-matched caulk at trim.
- Hardware heights consistent; soft-close tuned (no door “self-opening”).
- Seal grout; register all product warranties online.
9) Quality-Control Punch List (Don’t Skip It)
- Open/close every door & drawer; check reveals.
- Run all appliances (bake cycle, dishwasher, hood, disposal).
- Test GFCIs, dimmers, dedicated circuits, and gas shutoffs.
- Check caulks, scribe molding, and toe-kick seams.
- Confirm final inspection sticker(s) on site; collect owner manuals.
- Photograph finishes & serial numbers.
AZA Builders conducts a joint final walkthrough with you and resolves all punch items quickly then enrolls your project in our workmanship warranty program.
10) Aftercare & Warranty
- Clean with non-abrasive products; protect wood floors with felt pads.
- Reseal stone as needed; change hood filters per manufacturer.
- Keep your warranty folder (digital + paper) where you can find it.
- Book a 6-month check-in we’ll re-tune doors, review caulks, and answer maintenance questions.
Local Case Snapshots (Northern Virginia)
Fairfax • Pull-and-Replace, 9 Weeks
Kept layout; upgraded to semi-custom cabinets with full pantry pull-outs, quartz counters, and LED under-cabinet lighting. Result: +40% storage, brighter workspace, $52k total.
Arlington • Wall Removal & Re-Layout, 12 Weeks
Removed load-bearing wall (engineered beam), added island with seating, rerouted gas and updated panel. Result: Open plan with true triangle workflow, $98k total.
Leesburg • Compact Chef’s Kitchen, 8 Weeks
Galley to L-shape, cabinet insert accessories, 36″ range with 900 CFM hood, noise-rated. Result: Zero-clutter prep zones, $78k total.
Contractor Kitchen Remodel Checklist (Hire Like a Pro)
Verify & Vet
- Virginia Class A/B license • General liability & workers’ comp
- Local references in Fairfax/Arlington/Loudoun
- Portfolio with projects like yours (size, style, scope)
Scope & Contract
- Written scope with inclusions/exclusions
- Payment schedule tied to milestones, not dates
- Permitting responsibility clearly assigned
- Daily schedule/communication cadence
- Warranty terms in writing (materials + workmanship)
Red Flags
- Cash-only, vague bids, no permit plan, pressure tactics, “we’ll figure it out later.”
Good Signs
- Detailed line items, schedule with dependencies, proactive change-order policy, “we own permit & inspection” language.
AZA Builders is a licensed & insured local remodeler. We manage design, permits, construction, and inspections under one roof so you enjoy your kitchen sooner.

FAQs – Kitchen Remodeling Checklist (Northern Virginia)
What is a kitchen remodel checklist?
A step-by-step plan for budget, design, permits, ordering, build sequence, inspections, and punch list. Use ours above or request the printable PDF.
How much does a kitchen remodel cost in Northern VA?
Roughly $35k–$75k for pull-and-replace; $75k–$140k+ for reconfigurations/structural. We’ll price your exact scope after a free site visit.
How long does a kitchen remodel take?
About 6–10 weeks (pull-and-replace) and 10–14+ weeks (major). Lead times and inspections affect timing.
Do I need permits?
Yes for most electrical, plumbing, gas, and structural work. AZA Builders handles drawings, submissions, and inspections in Fairfax, Arlington, and Loudoun.
Can I live at home during the remodel?
Usually, yes. We set up a temporary kitchen, control dust, and keep essential utilities active when safe.
How do I save money without “going cheap”?
Keep the footprint, choose semi-custom cabinets, pick quartz counters, and invest in lighting & storage accessories over trendy splurges.
What order should I remodel a kitchen in?
Demo → rough-ins → inspections → drywall → flooring → cabinets → countertops → tile → finish MEP → punch list.
Will you help with design and selections?
Yes layout, cabinets, counters, tile, fixtures, 3D views, and a curated spec sheet to avoid backorders.
Service Areas – Northern Virginia
Fairfax, Arlington, Alexandria, Falls Church, McLean, Great Falls, Vienna, Oakton, Reston, Herndon, Leesburg, Ashburn, Sterling, Gainesville, Haymarket, Burke, Springfield, Fairfax Station, Woodbridge, Manassas, Chantilly, Centreville, Bristow, Aldie.
Ready to Use This Kitchen Remodel Checklist on Your Home?
Make this easy. Let AZA Builders bring the plan, the crew, and the calm. See us on Instagram & YouTube.