Your Vienna Estate, Configured.
2 signature models engineered for Vienna's specific site realities. Configure size, finish level, site conditions, and options - the investment envelope updates live, and your Estate Brief PDF captures all of it. New to the market? Read the Vienna engineering profile first.
Engineered precisely for Vienna's 25% lot-coverage law - a disciplined footprint that captures its square footage vertically, with a 10-foot underpinned lower level and full-height upper story.
Simplest pad preparation - civil dollars go to utilities, not grading.
The Church Street · 5,400 sf · Bespoke Architectural
Planning bands from AZA Builders' published Cost Index - not a quote. Your feasibility study converts this envelope into a Guaranteed Maximum Price (GMAX) ceiling.
Every configuration is a starting position, not a commitment. The feasibility study prices your actual parcel and locks the number under a Guaranteed Maximum Price (GMAX) contract.
Request a Feasibility Review