Garage Conversion Solutions
Garage Conversion Types

ADU (Accessory Dwelling Unit)

Home Office/Studio

Gym/Fitness Space

Entertainment Room
Design & Planning Options
Design Considerations
Space Planning
Optimize layout for maximum functionality and flow while maintaining building code compliance.
Window Placement
Strategic window installation to maximize natural light and ventilation while maintaining privacy.
Door Options
Connect your outdoor space to your smart home system for seamless control
Storage Solutions
Built-in storage systems to maintain organization and maximize usable space.
Lighting Design
Comprehensive lighting plan including ambient, task, and accent lighting for all activities.
Technical Requirements
Structural Modifications
Foundation Assessment
• Concrete slab evaluation • Moisture barrier installation • Drainage system review • Floor leveling requirements Wall Modifications
Insulation & Climate Control
Insulation Requirements
HVAC Considerations
Electrical & Plumbing Upgrades
Electrical Upgrades
Plumbing Installation
Flooring Options
Luxury Vinyl Plank
Polished Concrete
Engineered Hardwood
Before & After Gallery
See the incredible transformations we’ve created for families throughout the area. Each project showcases our commitment to quality and attention to detail.
Cost Calculator & Breakdown
Project Calculator
Cost Estimate
Cost Breakdown Includes:
- Structural modifications and framing
- Insulation and drywall installation
- Electrical and plumbing work
- Flooring and interior finishes
- Windows and door installation
- HVAC system integration
Materials & Options
Choose from premium materials and finishes to create your perfect exterior look.
Building Permits Required
Building Permit
Required for all structural modifications and new construction
Electrical Permit
Needed for new circuits, outlets, and lighting installation
Plumbing Permit
Required for bathroom or kitchen additions
Mechanical Permit
For HVAC system modifications or additions
Code Compliance
Egress Requirements
Proper window or door exits for safety compliance
Ceiling Height
Minimum 7'6" for habitable spaces
Insulation Standards
Meet local energy efficiency requirements
Fire Safety
Smoke detectors and fire separation requirements
Plan Preparation
We create detailed architectural plans and engineering drawings that meet all local requirements.
Application Submission
Submit all required permits and documentation to local building departments.
Plan Review
Building department reviews plans for code compliance and structural integrity.
Permit Approval
Receive approved permits and begin construction with proper inspections scheduled.
Building Permits Required
- Site plan and property survey
- Architectural floor plans
- Structural engineering drawings
- Electrical and plumbing plans
- Energy compliance calculations
- Contractor license and insurance
Building Permits Required
- Foundation inspection
- Framing inspection
- Electrical rough-in
- Plumbing rough-in
- nsulation inspection
- Final inspection
Project Timeline Information
Timeline Factors
Project Complexity
Simple conversions take 6-8 weeks, while full ADUs require 10-12 weeks for completion.
Permit Processing
Permit approval typically adds 2-4 weeks to the overall project timeline.
Weather Conditions
Seasonal weather may affect exterior work and material delivery schedules.
Material Availability
Custom materials or specialty items may require additional lead time for delivery.